McGraw Hill | Distribution Center
Dubuque, Iowa
Ruscilli successfully delivered the 330,000sf McGraw-Hill Distribution Center in an accelerated seven-month schedule, demonstrating the team’s ability to efficiently manage large-scale industrial and distribution projects. The facility was constructed using a pre-engineered metal building system combined with load-bearing precast concrete exterior walls, providing a durable, cost-effective structure designed to support high-volume distribution operations.
To meet the demanding operational requirements of the facility, Ruscilli installed a super-flat concrete floor and coordinated the integration of advanced conveyor systems essential to the owner’s distribution processes. Through careful planning, streamlined construction sequencing, and close coordination with trade partners, Ruscilli completed the project on time while delivering a modern distribution center optimized for efficiency, functionality, and long-term performance.














