Dublin City Council Chambers

This is a two phase project for the Dublin City Council consisting of 19,679 SF of renovations to an existing office space and additions totaling 11,675 SF. The project cost is $7.5M.

Phase I
The first phase project consists of renovating 19,679 SF of an existing office building to meet the growing needs of the City of Dublin administration.

Phase II
The second phase is the 11,675 SF addition of the building to house the new City of Dublin City Council Chambers.

Scioto Peninsula Riverfront

The redeveloped Scioto Riverfront Amphitheater serves as the “front door” for Ohio’s new Center Of Science and Industry (COSI) complex.  This picturesque outdoor venue hosts many downtown events and festivals and seats approximately 3,000.

Richland Correctional Institution

This 328,000 square foot 1,855-bed medium-security rehabilitation complex consists of dormitory-style rooms. The five dormitories accommodate 480 inmates each.

In addition, the 34-acre facility offers a recreation building with gymnasium and handball court, outdoor basketball courts and baseball fields, chapel/program building, multi-purpose activity center, administration building, vocational education classes, medical services, and dining area.

A separate maximum security segregation facility holds up to 100 additional inmates.

Santa Maria

Ruscilli completed mooring facilities, dredging, breakwater and boarding ramps for this 1800’s replica boat located in Battelle Park at the Scioto Riverfront.

George C. Voinovich Agriculture Trade Center

Ruscilli was selected to construct this 100,768 square foot facility on the Ohio State Fairgrounds. The Voinovich Agricultural Trade Center serves to host trade shows, livestock sales and exhibits, and various exhibitions and offers a seating capacity of 2,500.

Franklin County Juvenile Detention Center

This 134,000 square foot 132-bed four-story behavioral intervention housing institution includes a gymnasium, cafeteria, classrooms, courtyard and courtrooms. In addition, the complex is attached to the constructed three-story parking garage complete with connecting bridgeway to the Franklin County Courthouse.

Franklin County Courthouse

This 27-story courthouse and office tower consists of Municipal Courts, Administrative Offices, Juvenile Detention Center, Parking Garage and Hall of Justice. A plaza opening onto High Street connects the courthouse, Hall of Justice and Municipal Court Building. The ground floor of the courthouse tower houses a two-story granite clad lobby and 250-seat auditorium. Floors three through six contain the Domestic Relations court and Hearing Rooms. The upper 20 floors house the Court of Appeals, Probate Court, Judicial Administration, County Administration, Computer Center, and Cafeteria/Kitchen.

Franklin County Correctional Center

Phase One of this 186,000 square foot complex included construction of a new 625-bed correctional building as well as connection to an existing incarceration facility. Construction consisted of two new two-story wings, each surrounding a central courtyard. In addition, the project included interior courtyards, parking lots, driveways, curbs, walks, landscaping, security fencing and site utilities. The structure is a combination of cast-in-place concrete and concrete block with brick veneer. Due to the savings realized by Ruscilli during the initial phase, the County chose to construct a third wing rather than renovate the existing space. This65,000 square foot project allowed the County to add 225 beds to the previous facility, thereby totaling 850 beds. As with the prior two wings, this structure is a combination of cast-in-place concrete block with brick veneer.